Sunday, April 24, 2016
Presentation Slides
All presentation slides have been posted on our team blog! They are located in the side bar on the right of our team blog page; take a look!
Status Update 4/23/2016
Maker Faire is coming up, so the final stretch for the team is upon us. Below is the list of tasks that are being taken care to complete the Intermediate Solar Team's work.
- Solidworks drawings are finalized for the mounting system for the solar panels; done by David DeOcampo.
- Calculations are evaluated for accuracy, and put into a spreadsheet to display; done by Jaymie Zapata.
- Researching materials and costs, as well as purchasing/ordering/acquiring the materials is nearly complete; done by David Luo. A few wiring components will be delivered in the next couple days.
- We have distributed our information to other groups and acquired necessary information from them so that everyone is on the same page, and we are prepared for integration testing in the very near future.
- Construction has begun and is well underway. We will hopefully be completed by week's end, but for now we have enough completed for most integration testing.
Subscribe to:
Posts (Atom)